Elevation drawings

Elevation Drawings for Permits & HOAs

Straight-on views of each side of the building, with heights measured from grade, roof pitch, windows and exterior materials. Existing and proposed, drawn to scale.

  • Heights from grade
  • Roof pitch noted
  • Materials labelled
  • Existing & proposed
9'-0" PLATE15'-2" RIDGE ASPHALT SHINGLES6:12 PITCHFIBER-CEMENT SIDING FRONT ELEVATION · EXISTING SCALE: 1/4" = 1'-0"
NEW GARAGE 9'-0" PLATE15'-2" RIDGE12'-6" ASPHALT SHINGLES6:12 PITCHFIBER-CEMENT SIDING FRONT ELEVATION · PROPOSED SCALE: 1/4" = 1'-0"
Example: the same house before and after a garage addition. Drag to compare.

Example sheet

What’s on Your Elevation Sheet

A finished front elevation for a garage addition. Hover or tap a number to see what each part is and why the reviewer needs it.

Example sheet
NEW GARAGE 9'-0" PLATE15'-2" RIDGE12'-6" ASPHALT SHINGLES6:12 PITCHFIBER-CEMENT SIDING FRONT ELEVATION · PROPOSED SCALE: 1/4" = 1'-0" 12345678
  1. 1

    Overall height

    Measured from grade to the ridge, the number zoning height limits are checked against.

  2. 2

    Plate height

    Floor to the top of the wall, where the roof starts.

  3. 3

    Roof pitch and covering

    Slope as rise over run, and the roofing material.

  4. 4

    Windows and doors

    In the same places as the floor plan, at their real sizes.

  5. 5

    Exterior materials

    Siding, trim and finishes named, for the plan reviewer and the HOA.

  6. 6

    Finish grade line

    Where the ground meets the wall, so heights have a fixed starting point.

  7. 7

    New work highlighted

    The addition hatched, so it stands out from the existing house.

  8. 8

    View name and scale

    Which side this is, and the scale it’s drawn at.

  9. 9

    Title block with sources

    Address, scale, date and what the drawing was based on.

Your sheet shows the sides your county or HOA asks for, so it can differ from this example.

Quick answer

What Is an Elevation Drawing?

An elevation drawing is a flat, straight-on view of one side of a building, drawn to scale, showing its height, roof shape, windows, doors and exterior materials. Permit offices use elevations to check building height and appearance; HOAs use them to approve how a project will look from the street.

Reviewed by the MakeSitePlan drafting team · Updated October 2026

Also called
Exterior elevations, building elevations, front/side/rear views
Needed for
Additions, second storeys, garages, ADUs, new homes, porch and roof changes
Who asks for it
The building and zoning office; HOA architectural committees
What you send
Photos of each side and your floor plans, or a sketch
What you get
One scaled view per side, with heights and materials labelled
How many sides
Usually all four for new buildings; often just the affected sides for changes

What’s included

Always on the Elevations, Plus What Reviewers Add

A zoning reviewer cares about height; an HOA cares about looks. The left column is on every elevation we draw; the right is added when your permit or HOA asks for it.

AlwaysOn every elevation sheet

  • Each requested sideFront, rear and sides, labelled by direction
  • Heights from gradePlate height and overall ridge height
  • Roof pitchRise over run, with the roofing material
  • Windows and doorsMatching the floor plan locations
  • Exterior materialsSiding, trim, roofing and finishes
  • Finish grade lineWhere the ground meets each wall
  • Title block and scaleAddress, scale, date and sources

If askedAdded when your permit or HOA requires it

  • Existing and proposed viewsSide by side, so the change is obvious
  • Height limit lineYour zoning height limit drawn across the view
  • ColoursPaint and material colours named or rendered
  • Building sectionA cut through the building, for structure and ceiling heights
  • Neighbouring buildingsOutline of adjacent houses, for context
  • Window and door scheduleSizes and types in a table
  • Roof planRidges, valleys and slopes seen from above

By project

What Your Elevations Show for Your Project

The same view answers different questions on different projects. Pick yours to see what we put on the sheet.

House with a new addition under construction

Elevations for a home addition

  • Existing house and the addition, told apart
  • Addition roofline tying into the existing roof
  • Heights of both, measured from grade
  • Matching or new exterior materials

Often also asked for: floor plans and a site plan.

Also: second storeys, new homes, window and siding changes, and storefronts. Ask about yours

Is this the right drawing?

Elevation vs 3D Rendering vs Section

All three show a building from the side, but they answer different questions. Here’s which one your reviewer or HOA is asking for.

Comparison of an elevation drawing, a 3D rendering, a building section and a photo
Question Elevation drawing 3D rendering Building section Photo of the house
What it showsOne side, flat and to scaleA realistic view in colourA slice through the buildingWhat’s there today
MeasurableYesNoYesNo
Shows heightsYesNoYesNo
Shows the new workYesYesYesNo
Typical usePermits and HOA reviewHOA, buyers, planning boardsStructure and ceiling heightsBackground for us to draw from
We draw itYesYesYesYou take it. We use it

You need a rendering or section too if…

  • your HOA or design board asks to see colours and materials in context
  • the reviewer needs ceiling heights, floor-to-floor heights or the roof structure
  • you’re selling or pre-selling and buyers need to picture the finished house
  • a planning board will review the project at a public meeting

Not sure? Send your county’s checklist or the HOA’s rules with your quote request. We’ll tell you which drawings they ask for before you pay anything.

Plan review

What Reviewers Check on Elevations

Height is the number most elevations are checked for, and the one most often drawn wrong. We draw every sheet against this list.

  1. 01

    “Is the building under the height limit?”

    Overall height measured from grade the way your zoning code defines it, with the limit line drawn when asked.

  2. 02

    “Where is height measured from?”

    Finish grade shown on every view, so the starting point is clear even on sloped lots.

  3. 03

    “Does the roof pitch match the plans?”

    Pitch written on each roof plane and kept the same across every view.

  4. 04

    “Do the windows match the floor plan?”

    Windows and doors placed where the floor plan has them, at the same sizes.

  5. 05

    “What are the walls made of?”

    Every exterior material named, so the HOA and the reviewer agree on what’s being built.

  6. 06

    “Which side is which?”

    Each view titled by direction (north, south…) and keyed to the site plan.

Got comments on your elevations? We revise drawings to answer each reviewer or HOA comment, including drawings made by someone else.

Permit Corrections

What to send us

Photos of Each Side Get Us Most of the Way.

  • Required
    Property addressSo we can check height limits and requirements
  • Required
    What’s changing on the outsideAddition, new roof, new windows, new building
  • Helpful
    Photos of each sideStraight on, from as far back as you can
  • Helpful
    Floor plansKeeps windows and doors in the right places
  • Helpful
    One or two heightsEave or ridge height, if you can measure it
  • Helpful
    HOA rules or county checklistSo the sheet shows what they’ll look for

Can’t measure the roof? That’s normal. With your floor plans and one known height, like a door or eave, we work out the rest from your photos.

How it works

  1. 1

    Send the basics

    Use the quote form or WhatsApp. Two minutes.

  2. 2

    Approve your price

    We check what your permit or HOA needs and reply with the price and turnaround. Nothing starts until you approve.

  3. 3

    Get your PDF

    Drawn to scale and checked against the reviewer list above, ready to upload.

Deliverables & pricing

What You Receive, and What Sets the Price

We quote each set of elevations because buildings differ. Here’s exactly what you get, and what moves the price up or down.

File
Vector PDF, print-ready. Other formats on request
Sheet size
Matched to your permit office, usually 11 × 17 or 24 × 36
Scale
Usually 1/4" = 1'-0", or 1/8" for larger buildings
Title block
Address, project, date, scale and data sources
Revisions
Revision terms are written in your quote
Turnaround
Stated in your quote. Rush can be requested

What affects the price

  • Number of sidesEach view is its own drawing
  • Roof complexityHips, valleys and dormers take longer
  • Existing + proposedTwo versions of each side
  • Floor plans availableWithout them we draw from photos
  • Colours or materials boardFor HOA submissions
  • Rush deliveryWhen you need it sooner
Get My Exact Price

Free quote. You see the price before we start.

Where we work

Elevation Drawings Across the U.S.

We draw to the height rules and checklist your building department or HOA uses, wherever the property is.

Licensing varies by state. Some states require a licensed architect for certain buildings. If yours does, we tell you in the quote.

For HOAs

Want It in Colour?

Elevations show exactly what’s being built. A 3D rendering shows how it will look, which is often what an HOA committee wants to see.

We can make the rendering from the same drawings, so both match.

3D Renderings

Elevation FAQ

Elevation Drawing Questions

Short answers to what people ask before ordering. Ask anything else in your quote request.

Get Price Quote

Reviewed by the MakeSitePlan drafting team
Updated October 2026

How many sides do I need?

New buildings usually need all four. For additions or changes, many counties only ask for the sides that change, but some want every side. We check your county’s checklist in the quote.

Can you match my existing house?

Yes. From photos of each side and your floor plans, we draw the existing house first, then add the new work in the same style and materials.

How is building height measured?

It depends on your zoning code: some measure to the ridge, some to the midpoint of the roof, and grade can be the average or the lowest point. We draw it the way your code defines it.

Will my HOA accept elevations instead of a rendering?

Many do, as long as materials and colours are named. Some committees ask for colour, and then a 3D rendering is the better choice.

Do you show colours on elevations?

Elevations are usually black and white with materials labelled. We can add colour or a separate colour and material sheet for HOA reviews.

Do you need my floor plans?

They help a lot, because windows and doors must line up with them. Without plans we draw from photos and a few measurements.

Can you draw elevations for a building that isn’t built yet?

Yes. We draw new buildings from your floor plans, sketches or a designer’s concept.

What file will I get?

A vector PDF sized for your permit office, ready to print or upload. If you need another format, ask in your quote.

Chat with us