Home Addition Permit Plans
The drawings an addition needs: site plan with new setbacks, existing and proposed floor plans, elevations and the structure where the new meets the old.
- Permit needed?
- Yes, any addition that adds floor area needs a building permit.
- Who reviews it
- Building and zoning department, sometimes your HOA
- Full Permit Set
- Engineer’s Stamp
Drawings you’ll need
What a Addition Permit Asks For
Counties don’t all ask for the same drawings. This is what they usually want for a addition; we confirm your county’s list in the quote.
Plan review
What the County Checks on a Addition Permit
The items reviewers look for first. Every sheet we draw shows them.
-
01
Setbacks from the new walls
Addition dimensioned to every lot line it moves closer to.
-
02
Lot coverage
Coverage before and after, where your code limits it.
-
03
Existing vs new
Old and new walls told apart on every plan.
-
04
Roof tie-in
How the new roof meets the existing one, in elevations.
-
05
Structure
Foundation for the new footprint and beams where walls open up.
Permit sent back with comments? We revise drawings to answer each one, including plans drawn by someone else.
Permit CorrectionsWhat to send us
What to Send Us
- RequiredProperty addressSo we can check setbacks and coverage
- RequiredWhat you’re addingRooms, rough size and where
- HelpfulExisting plans or measurementsOf the part of the house you’re adding to
- HelpfulPhotos of each sideFor the elevations
Missing something? Send what you have. We start from county parcel records and aerial imagery, and ask if anything else is needed.
How it works
-
1
Send the basics
Use the quote form or WhatsApp. Two minutes.
-
2
Approve your price
We check your county’s requirements and reply with the price and turnaround. Nothing starts until you approve.
-
3
Get your drawings
Drawn to scale, ready to upload to your permit portal.
Addition permit FAQ
Addition Permit Questions
Short answers to what people ask before ordering. Ask anything else in your quote request.
Get Price QuoteWhich drawings does an addition need?
Usually a site plan, existing and proposed floor plans, elevations and structural details. Many counties ask for them as one set.
Do I need an engineer for an addition?
Often, for the foundation and any beam where an existing wall is opened up. We coordinate it through our licensed PE partner.
How close to my neighbour can I build?
It depends on your side setback, commonly 5 to 10 feet. We dimension the new walls to every line.
Can you draw my house as it is now?
Yes. From measurements, photos or old plans, we draw the existing house first, then the addition.